Four HIPERPRESS mini-plants are proposed to you: HIPERPRESS HP-300HP-300 plant can make 300 bricks per hour so its total performance is 2.400 bricks per shift and annual performance is 2.628.000 bricks per year. It consists of: - HPL-3SA preparatory line to prepare moulded mixture
- brick-making HPK1-100/12 press
- HPS-10 brick-splitter press
HPK1-100/12 does not use brick palletizer. HIPERPRESS HP-600HP-600 plant can make 600 bricks per hour so its total performance is 4.800 bricks per shift and annual performance is 5.256.000 bricks per year. It consists of: - HPL-3KA preparatory line to prepare moulded mixture
- brick-making HPK2-200/12 press
- HPZ-2 brick palletizer
- HPS-10 brick-splitter press
HIPERPRESS HP-1200HP-1200 plant can make 1.200 bricks per hour so its total performance is 9.600 bricks per shift and annual performance is 10.512.000 bricks per year. It consists of: - HPL-6KA preparatory line to prepare moulded mixture
- two brick-making HPK2-200/12 presses
- two HPZ-2 brick palletizers
- HPS-10 brick-splitter press
HIPERPRESS HP-1800HP-1800 plant can make 1.800 bricks per hour so its total performance is 14.400 bricks per shift and annual performance is 15.768.000 bricks per year. It consists of: - HPL-9KA preparatory line to prepare moulded mixture
- three brick-making HPK2-200/12 presses
- three HPZ-2 brick palletizers
- HPS-10 brick-splitter press
Comparative performance of plantsHIPERPRESS equipment is destined for daily operation so operational mode of HIPERPRESS mini-plants mainly depends upon internal schedule. The second mode - 2 shifts per 8 hours with 6 days working week (313 working days per year) is used more often. Computation of annual performance | plant | pcs/h | pcs/shift | annual production calculation |
|---|
| 1s x 8h x 5d | 2s x 8h x 6d | 3s x 8h x 7d | | HP-300 | 300 | 2.400 | 625.714 | 1.501.714 | 2.628.000 | | HP-600 | 600 | 4.800 | 1.251.429 | 3.003.429 | 5.256.000 | | HP-1200 | 1.200 | 9.600 | 2.502.857 | 6.006.857 | 10.512.000 | | HP-1800 | 1.800 | 14.400 | 3.754.286 | 9.010.286 | 15.768.000 | | | | load: 24% | load: 57% | load: 100% |  |
|---|
It should be noted that HIPERPRESS plants are also profitable when working 5 days a week in 1 shift and shift duration is 8 hours. But at such operating mode the term of cover of expenditure becomes longer. |